R - Painting

Project Account and Cost Code for Painting


Stem subRestDetailLevelUoMDescription
R     1   Painting
           
R*     2   Painting Group
RA     2 M2 Painting of Equipment A/M/T/H
RP     2 M2 Painting of Equipment P/G
RF     2 M2 Painting of Storage Tanks
RC     2 M Painting of Piping
RD     2 M2 Painting of Structural Steel
RY     2 M2 Misc. Painting
           
RA *   3   Painting Location
RA F   3 M2 Field
RA S   3 M2 Shop
           
RA _*   4   Equipment Group
RA _A   4 M2 Towers
RA _M   4 M2 Vessels
RA _T   4 M2 Exchangers
RA _H   4 M2 Heaters
           
RA __*   5   Number of Coats
RA __1   5 M2 1 Coat
RA __2   5 M2 2 Coats
RA __3   5 M2 3 Coats
RA __4   5 M2 4 Coats
RA ___*   6   Surface Preparation
RA ___A   6 M2 Degreasing & Touch Up
RA ___B   6 M2 Wirebrushing
RA ___C   6 M2 Blast Cleaning Sa2
RA ___D   6 M2 Blast Cleaning Sa2.5
RA ___E   6 M2 Blast Cleaning Sa3
RA   ___*** 7   Layer Thickness (micron)
RA   ___... 7 M2 - any number -
           
RA ____*   8   Paint Material
RA ____1   8 M2 Alkyd
RA ____2   8 M2 Chloor Rubber
RA ____3   8 M2 Epoxy
RA ____4   8 M2 High Built Epoxy
           
RA _____*   9   Application Method
RA _____1   9 M2 Brushing
RA _____2   9 M2 Spraying
           
RP *   3   Painting Location
RP F   3 M2 Field
RP S   3 M2 Shop
           
RP _*   4   Type of Equipment
RP _P   4 M2 Pumps & Compressors
RP _G   4 M2 Special Equipment
           
RP __*   5   Number of Coats
RP __1   5 M2 1 Coat
RP __2   5 M2 2 Coats
RP __3   5 M2 3 Coats
RP __4   5 M2 4 Coats
RP ___*   5   Surface Preparation
RP ___A   5 M2 Degreasing & Touch Up
RP ___B   5 M2 Wirebrushing
RP ___C   5 M2 Blast Cleaning Sa2
RP ___D   5 M2 Blast Cleaning Sa2.5
RP ___E   5 M2 Blast Cleaning Sa3

Stem subRestDetailLevelUoMDescription
           
RP ____*   5   Paint Material
RP ____1   5 M2 Alkyd
RP ____2   5 M2 Chloor Rubber
RP ____3   5 M2 Epoxy
RP ____4   5 M2 High Built Epoxy
           
RP _____*   5   Application Method
RP _____1   5 M2 Brushing
RP _____2   5 M2 Spraying
           
RP   ___*** 6   Layer Thickness (micron)
RP   ___... 6 M2 - any number -
           
           
RF *   3   Painting Location
RF F   3 M2 Field
RF S   3 M2 Shop
           
RF _*   4   Painting Surface
RF _E   4 M2 External
RF _I   4 M2 Internal
           
RF __*   5   Number of Coats
RF __1   5 M2 1 Coat
RF __2   5 M2 2 Coats
RF __3   5 M2 3 Coats
RF __4   5 M2 4 Coats
RF ___*   5   Surface Preparation
RF ___A   5 M2 Degreasing & Touch Up
RF ___B   5 M2 Wirebrushing
RF ___C   5 M2 Blast Cleaning Sa2
RF ___D   5 M2 Blast Cleaning Sa2.5
RF ___E   5 M2 Blast Cleaning Sa3
RF ____*   5   Paint Material
RF ____1   5 M2 Alkyd
RF ____2   5 M2 Chloor Rubber
RF ____3   5 M2 Epoxy
RF ____4   5 M2 High Built Epoxy
           
RF _____*   5   Application Method
RF _____1   5 M2 Brushing
RF _____2   5 M2 Spraying
           
RF   ___*** 6   Layer Thickness (micron)
RF   ___... 6 M2 - any number -
           
RC *   3   Painting Location
RC F   3 M Field/Non Insulated
RC S   3 M Shop
RC N   3 M Field/Insulated
           
RC __*   4   Number of Coats
RC __1   4 M2 1 Coat
RC __2   4 M2 2 Coats
RC __3   4 M2 3 Coats
RC __4   4 M2 4 Coats
           
RC ___*   5   Surface Preparation
RC ___A   5 M Degreasing & Touch Up
RC ___B   5 M Wirebrushing
RC ___C   5 M Blast Cleaning Sa2
RC ___D   5 M Blast Cleaning Sa2.5
RC ___E   5 M Blast Cleaning Sa3

Stem subRestDetailLevelUoMDescription
           
RC _*   6   Piping Component
RC _B   6 EA Fittings
RC _F   6 EA Flanges
RC _M   6 EA Manifolds
RC _P   6 M Pipe
RC _V   6 EA Valves
RC _X   6 EA Piping
RC   * 7   Size Group
RC   ** 8   Size
           
RC   1 7   < 2"
RC   10 8   Small Bore
RC   11 8   1/8"
RC   12 8   0.25"
RC   13 8   3/8"
RC   14 8   0.5"
RC   15 8   5/8"
RC   16 8   0.75"
RC   17 8   1"
RC   18 8   1.25"
RC   19 8   1.5"
           
RC   2 7   2- 6"
RC   20 8   Medium Bore
RC   21 8   2"
RC   22 8   2.5"
RC   23 8   3"
RC   24 8   4"
RC   25 8   5"
RC   26 8   6"
           
RC   3 7   8-12"
RC   30 8   Large Bore
RC   31 8   8"
RC   32 8   10"
RC   33 8   12"
           
RC   4 7   14-24"
RC   40 8   LB4
RC   41 8   14"
RC   42 8   16"
RC   43 8   18"
RC   44 8   20"
RC   45 8   22"
RC   46 8   24"
           
RC   5 7   26-36"
RC   50 8   LB5
RC   51 8   26"
RC   52 8   28"
RC   53 8   30"
RC   54 8   32"
RC   55 8   34"
RC   56 8   36"
           
RC   6 7   38-48"
RC   60 8   LB6
RC   61 8   38"
RC   62 8   40"
RC   63 8   42"
RC   64 8   44"
RC   65 8   46"
RC   66 8   48"

Stem subRestDetailLevelUoMDescription
           
RC   7 7   >48"
RC   70 8   LB7
RC   71 8   52"
RC   72 8   54"
RC   73 8   56"
RC   74 8   58"
RC   75 8   60"
RC   76 8   64"
RC   77 8   68"
           
RC ____*   9   Paint Material
RC ____1   9 M Alkyd
RC ____2   9 M Chloor Rubber
RC ____3   9 M Epoxy
RC ____4   9 M High Built Epoxy
           
RC   ___*** 10   Layer Thickness (micron)
RC   ___... 10 M - any number -
           
RC _____*   11   Application Method
RC _____1   11 M Brushing
RC _____2   11 M Spraying
           
RD *   3   Painting Location
RD F   3 M2 Field
RD S   3 M2 Shop
           
RD _*   4   Steel Category
RD _A   4 M2 Members < 22 kg/M
RD _B   4 M2 Members 22- 70kg/M
RD _C   4 M2 Members 70-120kg/M
RD _D   4 M2 Members >120 kg/M
RD _F   4 M2 Flooring
RD _H   4 M2 Handrail
RD _L   4 M2 Ladders with Cage
RD _S   4 M2 Pipesupports
           
RD __*   5   Number of Coats
RD __1   5 M2 1 Coat
RD __2   5 M2 2 Coats
RD __3   5 M2 3 Coats
RD __4   5 M2 4 Coats
RD ___*   5   Surface Preparation
RD ___A   5 M2 Degreasing & Touch Up
RD ___B   5 M2 Wirebrushing
RD ___C   5 M2 Blast Cleaning Sa2
RD ___D   5 M2 Blast Cleaning Sa2.5
RD ___E   5 M2 Blast Cleaning Sa3
           
RD ____*   5   Paint Material
RD ____1   5 M2 Alkyd
RD ____2   5 M2 Chloor Rubber
RD ____3   5 M2 Epoxy
RD ____4   5 M2 High Built Epoxy
           
RD _____*   5   Application Method
RD _____1   5 M2 Brushing
RD _____2   5 M2 Spraying
           
RD   ___*** 6   Layer Thickness (micron)
RD   ___... 6 M2 - any number -

Piping Design

Advanced Piping Design book from Gulf Publishing Company for which Red-Bag provided the co-author.

Overview of Library

The Library section of the Red-Bag website contains information for the process industry. Read more ...

Contact

Preferably us the e-mail form for your first contact. Click here ...

Education

InIPED, provider of choice for high quality training. Read more ...

'reliability is yet to become the most important characteristic of modern companies'
About | Privacy | Legal | Vision
© Red-Bag