| Number | Title |
| BN-SP-B1 | Building Specification (Standard) |
| BN-SP-B5 | General Building Design Specification |
| BN-SP-C04 | Design Pipe Supports |
| BN-SP-C51G | Spezifikation Fur Anwendung Der Druckbehalterveordnung (Dvo)auf Rohrleitungen Uberwachungspflichtig Nach Druckbehvab 01-05-1989 |
| BN-SP-C55 | Pulsation and Mechanical Response Studies for Reciprocating Compressors |
| BN-SP-DS1 | Structural Steel Specification, Standard |
| BN-SP-EF01 | Industrial Fluorescent Lighting Fixtures For Use In Potentially Explosive Atmospheres |
| BN-SP-EF02 | Industrial Incandescent Lighting Fixtures |
| BN-SP-EF03 | Industrial High Pressure Mercury Vapor Floodlights and Ballasts |
| BN-SP-EK01 | Low Voltage Underground and Aboveground Cables (Pvc and rubber Insulated) |
| BN-SP-EM01 | Static Uninterruptible Power Supply System (Ups) |
| BN-SP-EM04 | Squirrel Cage Induction Motor With Control Panel for Stepless Speed Control Variable Speed Driver Control |
| BN-SP-ES01 | Standard Metal Enclosed Medium Voltage Draw-Out Switchgear |
| BN-SP-ES03 | Standard Low Voltage Switchboards and Mcc's of the Draw-Out Type |
| BN-SP-ES04 | Low-Voltage Switchgear Nondraw-Out, Unit or Cubicle Type |
| BN-SP-ES05 | Power Factor Correction Capacitor Equipment Hv and Lv Type Not Monted In Switchgear |
| BN-SP-ES06 | Inspection Metal Enclosed High Voltage Draw-Out Switch Gear |
| BN-SP-ES07 | Inspection Procedure Lv Draw-Out Switchgear |
| BN-SP-EY01 | Remote Control Units and Safety Switches |
| BN-SP-EY05 | Streetlighting and Floodlighting Poles of Metal Construction for Areas With Explosion Danger and Safe Areas |
| BN-SP-EY08 | Turbine Driven Generators 3 Phase, Synchronous Type |
| BN-SP-EY09 | Backpressure/condensing Exhaust to Atmosphere Steamturbine Driven No-Break Generator |
| BN-SP-EZ02 | Electrical Materials, Equipment and Installations Forming Part of a Package Unit |
| BN-SP-F1 | Determination of Fireproofing Requirements |
| BN-SP-F2 | Lightweight Fireproofing on supporting Structures for Equipment and Piping |
| BN-SP-F3 | Fireproofing Compounds for Cable Trays, Conduits, Structural Steel Members and Equipment Supports |
| BN-SP-FA1 | Brickwork Fireproofing of Vessel Skirts |
| BN-SP-FA2 | Gunite Fireproofing of Vessel Skirts |
| BN-SP-J1 | Civil Design Specification |
| BN-SP-J2 | Civil Construction Work |
| BN-SP-JL1 | Pre-Cast Reinforced Concrete Piles, Installation of |
| BN-SP-JL2 | Driven Cast-in-Situ Reinforced Concrete Piles, Manufacture of |
| BN-SP-JL3 | Pre-Cast Reinforced Concrete Piles, Manufacture of |
| BN-SP-JL4 | Non-Driven Cast-In Situ Reinforced Concrete Piles, Manufacture of |
| BN-SP-K1 | Engineering and Design Instrumentation |
| BN-SP-K10 | General Instrument Testing, Calibration and Acceptance |
| BN-SP-K2 | Engineering Design the Accessibility Of instruments and Instrument Connection |
| BN-SP-K3 | Engineering Design the Limitation of Control Valve Noise |
| BN-SP-K4 | General Instrument Panels and Auxiliary Systems |
| BN-SP-K5 | Functional a Signal Processing System |
| BN-SP-K7 | General Specification for Instrument Requirements on Packaged Units |
| BN-SP-K8 | General Specification for the Installation of Instrumentation |
| BN-SP-K9 | General Specification for the Fabrication of Orifice Meter Runs |
| BN-SP-N1 | Thermal Insulation Hot Service Mineral-Wool |
| BN-SP-N2 | Thermal Insulation Cold Service |
| BN-SP-N3 | Monolithic Lining Concrete Type, In Non-Fired Process Equipment |
| BN-SP-N4 | Refractories In Direct Fired Process Equipment and Boilers |
| BN-SP-N6 | Thermal Insulation Hot Service Calcium Silicate |
| BN-SP-Q1 | Installation of Sewers and Underground Piping |
| BN-SP-R1 | Shop Priming, Shop Painting and Field Painting |
| BN-SP-R2 | Internal Coatings |
| BN-SP-S1 | Site Preparation Work |
| BN-SP-SF1 | Fencing |
| BN-SP-SP1 | Roads |
| BN-SP-ST1 | Control of Tank Settlement During Preload and Water Test, Specification for |
| BN-SP-ST2 | Control of Tank Settlement During Water Test, Specification for |
| BN-SP-UE301 | Positive Material Identification (PMI) |
| BN-SP-UK001 | Site QA/QC Requirements for Subcontractors |
| BN-SP-UP501 | Packing and Marking of Material and Equipment |
| BN-SP-UP502 | Packing, Marking and Shipping (Overland) |
| BN-SP-UP503 | Transportation Plan ... |
| BN-SP-UP504 | Shipping (Overseas) |