BN-EF0001 Requisition for Industrial Lighting Fixtures |
|
|
Scope
This requisition covers the supply of fluorescent lighting fixtures in accordance with the applicable specification and the data presented herein. Full documentation as required in the inquiry, order or attached document shall be supplied in the quantities and at the times specified.
________________________________________________________________________________
1. Company specifications(s)
2. Standards
3. Hazardous category Fixture, Gasgroup, Lampholder
4. Plant location
5. Site conditions
6. Minimum ambient temperature
7. Maximum ambient temperature
8. Voltage
9. Frequency
________________________________________________________________________________
|
| 10. |
Item no
|
1
|
2
|
3
|
4
|
| 11. |
Fluorescent lamps
|
|
|
|
|
| 12. |
Quantity
|
|
|
|
|
| 13. |
Hazardous category : E
R
N
|
|
|
|
|
| 14. |
Degree of protection in accordance with DIN 40050
|
|
|
|
|
| 15. |
Transparent cover required
|
|
|
|
|
| 16. |
Protective wire guard required
|
|
|
|
|
| 17. |
Internal aluminum reflector required or other kind of reflector material
|
|
|
|
|
| 18. |
Color of tubes
|
|
|
|
|
| 19. |
Power factor correction required
|
|
|
|
|
| 20. |
External surface temperature fixture in degrees °C
|
|
|
|
|
| 21. |
Way of mounting : G
H
J
T
|
|
|
|
|
| 22. |
Radio interference screening required
|
|
|
|
|
| 23. |
Approved test certificates of an independent laboratory required
|
|
|
|
|
| 24. |
Number of keys for relamping
|
|
|
|
|
| 25. |
Cable diameter
|
|
|
|
|
| 26. |
Number of cable glands
|
|
|
|
|
| 27. |
Through wiring
|
phase +neutral mm2
|
phase +neutral mm2
|
phase +neutral mm2
|
phase +neutral mm2
|
| 28. |
Material of body
|
|
|
|
|
| 29. |
Tubes are part of the supply
|
yes/no
|
yes/no
|
yes/no
|
yes/no
|
Deviations from specification and requisition
(To be filled in by Vendor)
Approved vendor deviations from specification and requisitions
Client’s additional requirements to company’s specification and requisition
“ Vendor furnished documents ” “ E Account ”
Vendor shall furnish documents as marked (*) below
IMPORTANT : all documents shall be in english and SHALL show Company‘s order- and item number
|
1.
|
TOGETHER WITH QUOTATION, COPIES OF :
|
|
|
0
|
DIMENSIONAL OUTLINE DRAWINGS (General Arrangement, Main Weights )
|
|
0
|
COMPLETED PURCHASER&lsqou;S DATA SHEETS
|
|
0
|
TEST CERTIFICATES
|
|
0
|
SCHEMATIC DIAGRAMS SHOWING ALL ELECTRIACL COMPONENTS
|
|
0
|
MANUFACTURER&lsqou;S LEAFLETS AND CURVES GIVING COMPLETE DETAIL OF ALL ELECTRICAL COMPONENTS
|
|
0
|
PRICED SPARE PARTS LIST, FOR __ YEAR(S) OPERATION
|
|
0
|
QUALITY MANUAL IN ACCORDANCE WITH ISO9000 SERIES OR EQUIVALENT (1 COPY ONLY)
|
|
0
|
|
|
|
2.
|
IN CASE OF ORDER (cost of documents to be included in vendor‘s price)
|
|
|
A
|
|
1 Repro and/or Copies for approval prior to fabrication
|
To be submitted within (weeks):
|
|
|
B
|
1 Repro and/or Copies for record purposes only
|
|
0
|
0
|
CERTIFIED DIMENSIONAL OUTLINE DRAWING INCL. WEIGHTS
|
_
|
|
0
|
0
|
COMPLETED PURCHASER‘S DATA SHEETS
|
_
|
|
0
|
0
|
CERTIFIED TEST CERTIFICATES
|
_
|
|
0
|
0
|
SCHEMATIC DIAGRAMS SHOWING ALL ELCETRICAL COMPONENTS
|
_
|
|
0
|
0
|
WIRING- AND/OR PRINCIPLE DIAGRAMS
|
_
|
|
0
|
0
|
MANUFACTURER‘S LEAFLETS AND CURVES GIVING COMPLETE DETAIL OF ALL ELECTRICAL COMPONENTS
|
_
|
|
0
|
0
|
ERECTION DRAWINGS AND INSTALLATION MANAUALS
|
_
|
|
0
|
0
|
DRAWINGS SHOWING ALL CIVIL PROVISIONS, LOADINGS, ANCHOR BOLT LOCATION ETC.
|
_
|
|
0
|
0
|
GENERAL ARRANGEMENT DRAWINGS
|
_
|
|
0
|
0
|
OPERATING/MAINTENANCE MANUALS INCLUDING PARTLIST
|
_
|
|
0
|
0
|
QUALITY/INSPECTION AND TEST PLAN
|
_
|
|
->
|
->
|
WITHNIN __ WEEKS AFTER APPROVAL 1 REPRO AND/OR __ COPIES OF CERTIFIED FINAL DRAWINGS, ETC. ARE REQUIRED
|
_
|
|
|
3.
|
TEST/INSPECTION
|
|
|
COPIES OF OTHER DOCUMENTS (to be submitted immediately after test/inspection)
|
|
|
|
0
|
CERTIFIED TEST REPORTS
|
|
0
|
CERTIFIED PERFORMANCE CURVES
|
|
0
|
|
|
|