to home page

 
PCC Software

Software for creation of pipe classes and mechanical calculation of piping components. Read more ...
 
VES Software

Software for the design and mechanical calculation of pressure vessels and heat exchangers. Read more ...
Home Forms Quality Assurance and Safety
Quality Assurance and Safety Print E-mail
The Quality Assurance Department is an independent department reporting directly to the company management. Their responsibility includes that the quality procedures are used during the project execution.
The below documents are used to administer the audit and control by the QA Department on the use of the quality procedures.
Number(.PDF) Description
RB28010 Process Engineering, Project System Audit
RB28011 Systems Engineering, Group, Project System Audit
RB28012
Project and Engineering Management, Project System Audit
RB28013Planning and Scheduling Group, Project System Audit
RB28014Cost Engineering Group, Project System Audit
RB28015Material Control Group, Project System Audit
RB28016Plotplans, Project System Audit
RB28017Bulk (Piping) Take-off, Project System Audit
RB28018Piping Design Group, Project System Audit
RB28020 Piping Engineering Group, Project System Audit
RB28021 Electrial Group, Project System Audit
RB28022 Control Systems Group, Project System Audit
RB28023Mechanical Equipment Group, Project System Audit
RB28024Civil Group, Project System Audit
RB28025Architectural Group, Project System Audit
RB28026Architectural Consultan, Project System Audit
RB28027Structural Steel Group, Project System Audit
RB28028Purchasing Group, Project System Audit
RB28029Inspection Group, Project System Audit
RB28030Expediting Group, Project System Audit
RB28031Traffic Control Group, Project System Audit
RB28032Vendor Print Control Group, Project System Audit
RB28033Subcontracting Group, Project System Audit
RB28034HO Construction, Project System Audit
RB28035Site Construction, Project System Audit
RB28036Subcontractors on Site, Project System Audit
RB28037Construction Environmental, Health and Safet (EH&S), Project System
RB28038Authority Engineering Group, Project System Audit
RB28039Painting/Insulation Group, Project System Audit
RB28040Environment, Health&Safety (EH&S) Group, Project System Audit
RB28041Checklist for Annual Management Assessment
 
 
Badger52_jpg.jpg
'reliability is yet to become the most important characterstic of modern companies'
home | privacy | legal
© 2001 - 2011 Red-Bag