|
Construction Organization |
|
|
|
The construction phase of the project is executed on the construction site. A construction manager is the head of the construction team and are responsible for the overall construction execution at the site, including safety, correct installation of equipment and material handling. Below are some documents as used by the construction team to execute their work. | Number(.PDF) | Description | | RB26010 | Day Log First Aid Treatment | | RB26011 | Day Log Medical Treatment
| | RB26012 | First Aid Acitivity Report
| | RB26013 | Employee Treatment Record
| | RB26014 | Safety Non-Conformance
| | RB26015 | Hot Work Permit
| | RB26016 | Cold Work Permit
| | RB26017 | Excavation Permit | | RB26018 | Enclosed Space Entry Permit
| | RB26019 | Electrical Wor/Switch Permit | | RB26020 | Radiographic Inspection Permit
| | RB26021 | Safety Inspection Report
| | RB26022 | Near Miss/Lost Time Bulletin
| | RB26031 | Daily Material Receiving Record
| | RB26032 | Marterial Receiving Notice
| | RB26033 | Material Receipt Notice
| | RB26034 | Material Receiving Notice Register | | RB26035 | Over, Short and Damage Report | | RB26036 | Over, Short and Damage Report Register
| | RB26037 | Material Requisistion | | RB26038 | Materials Stock Record Card
| | RB26039 | Out Shipment Report
| | RB26040 | Out Shipment Report Register
| | RB26041 | Purchase and Bid Comparison
| | RB26042 | Requisition Register
| | RB26043 | Field Purchase Order Register
| | RB26045 | Field Expediting Report
| | RB26046 | Cable Reel Register
| | RB26047 | Cable Reel Issue Register
| | RB26061 | Subcontract Bidders List
| | RB26062 | Subcontract Bids Opening
| | RB26063 | Pay Item Authorization | | RB26064 | Extra Work Authorization | | RB26065 | Extra Work Authorization Report
| | RB26066 | Work Report for Daily Work Orders
| | RB26067 | Progress Payment Certificate
| | RB26068 | Backcharge to Vendor | | RB26069 | Backcharge Register | | RB26090 | Field Purchase Cost Control Register
| RB26121
| Internal Field Document Distribution Schedule
| | RB26122 | Daily Field Force Report
| | RB26123 | Monthly Job Summary | | RB26124 | Site Survey Checklist
|
|