| Number(.PDF) |
Description |
| RB26C01 |
Piping Test System Register |
| RB26C02 |
Inspection Record for Piping Release for Flushing and Pressure Testing |
| RB26C03 |
Inspection and Test Record for Piping Completion and Certificate for Flushing, Pressure Testing, Blowing, Reinstatement and Completion |
| RB26C04 |
Inspection and Test Record for Underground Piping |
| RB26C05 |
Pressure Test Record (Piping) |
| RB26C30 |
Inspection Record for Site Welding |
| RB26C31 |
Weld Repair Report |
| RB26C32 |
Inspection Report for Field Welds |
| RB26C33 |
Radiograph Inspection Report |
| RB26C34 |
Radiography Record Sheet |
| RB26C35 |
Record of Welder Performance Qualification Test on Groove Welds |
| RB26E01 |
Inpsection Record for Underground Cable Pulling |
| RB26E02 |
Inspection Record for Cable Trays/Ladders |
| RB26E03 |
Inpsection and Test Record for L.V. Cable |
| RB26E04 |
Test Record for Distribution Feeder Cable (M.V./H.V.) |
| RB26E05 |
Inspection Record for Earting Systems |
| RB26E06 |
Continuity Tests Record of Earthing Conductors for Equipment |
| RB26E07 |
Earth Electrode Resistance Test Record |
| RB26E08 |
Inspection Record for Electrical Heat Tracing |
| RB26E09 |
Inspection Record for Basic Inspection of Electrical Equipment |
| RB26E10 |
Inspection Record for Switch Houses (including transformer yards) |
| RB26E11 |
Inspection and Test Record for Bus-Bar Assemblies - HV Switchgear |
| RB26E12 |
Inspection and Test for Record for Switching Units - HV Switchgear |
| RB26E13 |
Inspection and Test Record for Bus-Bar Assemblies - LV Switchgear (including incoming and sectionalizer units) |
| RB26E14 |
Inspection and Test Record for Outgoing Units - LV Switchgear |
| RB26E15 |
LV Overcurrent and Earth-Fault Protection Relay Test Record |
| RB26E16 |
Inspection and Test Record for Power Transformer |
| RB26E17 |
Inspection and Test Record for Voltage Transformer (and UV Relay) |
| RB26E18 |
Test Record for Current Transformer (and Ammeter) |
| RB26E19 |
Test Record for Overcurrent/Earth/Fault Protection Relay (induction type) |
| RB26E20 |
Test Record for Overcurrent/Earth/Fault Protection Relay (thermal type) |
| RB26E21 |
Test Record for Differential Protection Relay |
| RB26E22 |
Inspection and Test Record for Electric Motor - Cage-Induction Type (including control unit) |
| RB26E23 |
Inspection and Test Record for Static Supply Unit |
| RB26E24 |
Inspection and Test Record for Emergency Generators |
| RB26E25 |
Inspection and Test Record for Lighting Installation (including distribution board) |
| RB26G01 |
Inspection Record for Air Handling Units |
| RB26G02 |
Inspection Record for Airflow Control Devices |
| RB26G03 |
Inspection Record for Air Diffusing Equipment |
| RB26G04 |
Inspection Record for Air Ducting System |
| RB26G05 |
Test Record for Pressure/Vacuum** Test of HVAC System |
| RB26G06 |
Overall Inspection Record for HVAC System |
| RB26J01 |
Setting-out Report for Plant Benchmarks |
| RB26J02 |
Piling Report |
| RB26J03 |
Inspection Record for Concrete Works (Authorization to Pour) |
| RB26J04 |
Concrete Placement Record |
| RB26J05 |
Inspection Record for Finished Concrete Works |
| RB26J06 |
Concrete Cylinder/Cube Report |
| RB26J07 |
Concrete Test Results |
| RB26J08 |
Summary of Concrete Test Results |
| RB26J09 |
Foundation Settlement Data Report |
| RB26J10 |
Inspection Record for Grouting |
| RB26J11 |
Inspection and Test Record for Sewers |
| RB26J12 |
Inspection and Test Record for Waterproof Membrane of Basin |
| RB26J13 |
Inspection Record for Paving and Subgrade/Soil in General |
| RB26J14 |
Inspection Record for Roads/Carparks |
| RB26J15 |
Inspection and Test Record for Retention Basins |
| RB26J16 |
Inspection Record for Steel Structures |
| RB26J17 |
Inspection Record for Fireproofing |
| RB26J18 |
Inspection Record for Refractory Linings |
| RB26J19 |
Inspection Record for Blockwork |
| RB26J20 |
Inspection Record for Wall Insulation of Buildings |
| RB26J21 |
Inspection Record for Roof Insulation and Roofing of Buildings |
| RB26J22 |
Inspection Record for Wall Cladding of Buildings/Structures |
| RB26J23 |
Inspection Record for Suspended Ceiling of Buildings |
| RB26J24 |
Inspection Record for Windows, Doors, Openings of Buildings |
| RB26J25 |
Inspection and Test Record for Plumbinb/Sanitary Installation of Buildings |
| RB26J26 |
Inspection Record for Internal Finishing of Buildings |
| RB26J27 |
Inspection Record for Complete Building (minor building) |
| RB26J28 |
Inspection Record for Fencing |
| RB26J29 |
Inspection Record for Gates |
| RB26J30 |
Inspection and Test Record for Boom Gates |
| RB26K01 |
Inspection and Test Record for Loop Checks |
| RB26K02 |
Inspection and Test Record for Instrument Pre-installation and Calibration |
| RB26K03 |
Inspection and Test Record for Control Valve Pre-installation |
| RB26K04 |
Inspection and Test Record for Trip and Alarm Checks |
| RB26K05 |
Inspection for Instrument Installation and Mechanical Acceptance Form |
| RB26K06 |
Inspection Record for Cabinets/Consoles |
| RB26K07 |
Inspection Record for Installation Acceptance of Safeguarding System and/or Sequential System |
| RB26K08 |
Inspection Record for Installation Acceptance of DCS System |
| RB26K09 |
Inspection Record for Junction Boxes |
| RB26K10 |
Inspection Record for Instrument Earting System |
| RB26K11 |
Inspection Record for Instrument Air Supply Pressure Test |
| RB26K12 |
Inspection Record for On-line Stream Analyzers (General) and Analyzer House |
| RB26K13 |
Inspection Record for Process Gas Chromatograph and Acceptance Sheet |
| RB26K14 |
Inspection Record for Erection of Flow, Pressure, Level, Switches |
| RB26K15 |
Cable Insulation and Continuity Test Report Instrument Cables |
| RB26K16 |
Orifice Plate Installation Record |
| RB26K17 |
Tracking Document for Instrument Connections to Piping and Mechanical Equipment |
| RB26K18 |
Preliminary Mechanical Acceptance Report for Instrumentation |
| RB26K19 |
Inspection Record for Local Indicating Instruments Pressure, Temperature, Flow and Level Gauges |
| RB26K20 |
Inspection Record for Instrument Impulse Hook-ups |
| RB26M01 |
Equipment Incoming Inspection Record |
| RB26M02 |
Inspection Record for Towers/Vessels and Closing Certificate |
| RB26M03 |
Inspection and Test Record for Tanks and Closing Certificate |
| RB26M04 |
Tank Test Certificate |
| RB26M05 |
Record of Vessel Tests |
| RB26M06 |
New Equipment Data - Radiographic Inspection Report |
| RB26M07 |
Inspection Record for Exchangers |
| RB26M08 |
Inspection Record for Air Coolers |
| RB26M09 |
Run-in Test Record for Air Coolers |
| RB26M10 |
Inspection Record for Mixers |
| RB26M11 |
Inspection Record for Cooling Towers and Closing Certificate |
| RB26M12 |
Inspection Record for Furnaces/Boilers and Closing Certificate |
| RB26M13 |
Inspection Record for Packaged Boiler Units and Closing Certificate |
| RB26M14 |
Inspeciton Record for Packaged Units: Vessels/Columns/Skids/Filters and Closing Certificate |
| RB26M15 |
Inspection Checklist for Travelling Cranes |
| RB26M16 |
Inspection and Test for Elevator and Hydraulic Lift Table |
| RB26N01 |
Inspection and Test Record for Painting |
| RB26N02 |
Inspection and Test Record for Insulation |
| RB26P01 |
Inspection and Test Record for Pump/Compressor Set |
| RB26P02 |
Test Record for Rotating Equipment Alignment |
| RB26P03 |
Inspection and Test Record for Alignment of Belt-driven Rotating Equipment |
| RB26P04 |
Inspection and Test Record for Mixers |
| RBY002 |
Site Quality Responsibilities Matrix |
| RBY003 |
Inspection and Test Plan (ITP) |
| RBY005A |
Quality Audit Schedule |
| RBY005B |
Notice of Quality Audit |
| RBY005C |
Report of Quality Audit |
| RBY005D |
Quality Audit Report Questionnaire |
| RBY005E |
Quality Audit Report Conclusions |
| RBY005F |
Quality Audit Log and Status Report |
| RBY007A |
Site Engineering Query (SEQ) |
| RBY007B |
Site Engineering Query Log and Status Report |
| RBY010A |
Nonconformance Report |
| RBY010B |
Nonconformance Log and Status Report |
| RBY022A |
Subcontractor's Request for Punchlisting |
| RBY022B |
Punchlist |
| RBY022C |
Punchlist Log and Status Report |
| RBY022D |
Certificate of Functional system Mechanical Completion - Ready for Start-up* and Turnover |