S - Site Development Project Account and Cost Code for Site Development | Stem sub | Rest | Detail | Level | UoM | Description | | S | | | 1 | M3 | Site Development | | | | | | | | | S* | | | 2 | | Site Development Group | | SE | | | 2 | M2 | Site Preparation | | SD | | | 2 | LOT | Demolition | | SB | | | 2 | M3 | Bundwalls | | SP | | | 2 | M2 | Roads | | SR | | | 2 | M | Railways | | SF | | | 2 | M | Fences & Gates | | ST | | | 2 | M2 | Tankpads | | SL | | | 2 | LOT | Jetty Piers & Quays | | SG | | | 2 | M3 | Large Basins & Pits | | SJ | | | 2 | M3 | Special Concrete Work | | SM | | | 2 | M3 | Groundwork for SG & SJ | | SQ | | | 2 | M | Ditches | | SX | | | 2 | LOT | Job Clean Up | | SY | | | 2 | PC | Miscellaneous Major Work | | SZ | | | 2 | M2 | Final Site Finishing | | | | | | | | | | | | | | | | SE | * | | 3 | | Preparation Function | | SE | A | | 3 | M2 | Site Cleaning | | SE | B | | 3 | M2 | Site Levelling | | SE | C | | 3 | M3 | Soil Improvement | | SE | D | | 3 | M3 | Main Earth Moving | | SE | E | | 3 | EA | Sand Piles | | | | | | | | | SE | _* | | 4 | | Groundwork Type | | SE | _1 | | 4 | M3 | Excavation | | SE | _2 | | 4 | M3 | Backfilling | | SE | _3 | | 4 | M3 | Transportation | | | | | | | | | SD | ** | | 3 | | Demolishing Item | | | | | | | | | SD | B | | 3 | M3 | Buildings | | SD | DC | | 3 | M3 | Concrete Structures | | SD | DS | | 3 | MT | Structural Steel | | SD | F | | 3 | M | Firewater Systems | | SD | J | | 3 | M3 | Below Grade Concrete | | SD | P | | 3 | M2 | Paving & Roads | | SD | Q | | 3 | M | Sewer Systems | | | | | | | | | SB | * | | 3 | | Construction Component | | SB | ** | | 4 | | Construction Component Details | | | | | | | | | SB | M | | 3 | M3 | Sand Body | | SB | M1 | | 4 | M3 | Excavation | | SB | M2 | | 4 | M3 | Terp Filling (incl.Compaction) | | SB | M3 | | 4 | M3 | Backfilling | | | | | | | | | SB | P | | 3 | M2 | Protective Layers | | SB | P1 | | 4 | M2 | Finish Top | | SB | P2 | | 4 | M2 | Finish Slopes | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | SB | __* | | 5 | M2 | Construction Material Code | | SB | __A | | 5 | M2 | Site Soil | | SB | __B | | 5 | M2 | Clean Sand | | SB | __C | | 5 | M2 | Clay | | SB | __D | | 5 | M2 | Gravel | | SB | __E | | 5 | M2 | Crushed Stone | | SB | __F | | 5 | M2 | Blast Furnace Slags | | SB | __G | | 5 | M2 | Asphalt | | SB | __H | | 5 | M2 | Sand-Bitumen | | SB | __J | | 5 | M2 | Concrete | | SB | __K | | 5 | M2 | Concrete-Asphalt | | SB | __L | | 5 | M2 | Macadam | | SB | __M | | 5 | M2 | Plastic Foil | | SB | __N | | 5 | M2 | Topsoil with Grass | | SB | __O | | 5 | M2 | Selected Fill | | | | | | | | | SB | | *** | 6 | | Layer Thickness (mm) | | SB | | ... | 6 | M2 | - any number - | | | | | | | | | SP | * | | 3 | | Road Function | | SP | A | | 3 | M2 | Main Road | | SP | B | | 3 | M2 | Plant Road | | SP | C | | 3 | M2 | Security Road | | | | | | | | | SP | ___*** | | 4 | | Road Width (cm) | | SP | ___... | | 4 | M2 | - any number - | | | | | | | | | SP | _* | | 5 | | Construction Component | | SP | _1 | | 5 | M2 | Sub Grade | | SP | _2 | | 5 | M2 | Sub Base | | SP | _3 | | 5 | M2 | Base Course | | SP | _4 | | 5 | M2 | Paving | | SP | _5 | | 5 | M2 | Shoulder Base | | SP | _6 | | 5 | M2 | Shoulder Finish | | | | | | | | | SP | __* | | 5 | | Material Code | | SP | __A | | 5 | M2 | Site Soil | | SP | __B | | 5 | M2 | Clean Sand | | SP | __C | | 5 | M2 | Clay | | SP | __D | | 5 | M2 | Gravel | | SP | __E | | 5 | M2 | Crushed Stone | | SP | __F | | 5 | M2 | Blast Furnace Slags | | SP | __G | | 5 | M2 | Asphalt | | SP | __H | | 5 | M2 | Sand-Bitumen | | SP | __J | | 5 | M2 | Concrete | | SP | __K | | 5 | M2 | Concrete-Asphalt | | SP | __L | | 5 | M2 | Macadam | | SP | __M | | 5 | M2 | Plastic Foil | | | | | | | | | SP | | *** | 7 | M2 | Layer Thickness (mm) | | SP | | ... | 7 | M2 | - any number - | | | | | | | | | SR | * | | 3 | | Track Component | | SR | A | | 3 | M | Straight Track | | SR | B | | 3 | M | Curved Track | | SR | C | | 3 | PC | Switch | | SR | D | | 3 | PC | Buffer | | SR | E | | 3 | PC | Crossing | | | | | | | | | SR | _* | | 4 | | Construction Component | | SR | _1 | | 4 | M3 | Subgrade | | SR | _2 | | 4 | M3 | Ballast Bed | | SR | _3 | | 4 | EA | Sleepers | | SR | _4 | | 4 | M | Rail | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | SR | __* | | 5 | M2 | Material Code | | SR | __A | | 5 | M2 | Site Soil | | SR | __B | | 5 | M2 | Clean Sand | | SR | __C | | 5 | M2 | Clay | | SR | __D | | 5 | M2 | Gravel | | SR | __E | | 5 | M2 | Crushed Stone | | SR | __F | | 5 | M2 | Blast Furnace Slags | | SR | __G | | 5 | M2 | Asphalt | | SR | __H | | 5 | M2 | Sand-Bitumen | | SR | __J | | 5 | M2 | Concrete | | SR | __K | | 5 | M2 | Concrete-Asphalt | | SR | __L | | 5 | M2 | Macadam | | SR | __M | | 5 | M2 | Plastic Foil | | SR | __1 | | 5 | M2 | Carbon Steel | | | | | | | | | SR | __* | *** | 6 | | Layer Thickness (mm) | | SR | __1 | ... | 6 | M2 | - any number - | | SR | __2 | ... | 6 | M2 | - any number - | | SR | __3 | ... | 6 | M2 | | | SR | __4 | ... | 6 | M2 | | | | | | | | | | SF | * | | 3 | | Fence Component | | SF | ** | | 4 | | Component Type | | | | | | | | | SF | F | | 3 | M | Fence | | SF | FB | | 4 | M | Bars | | SF | FC | | 4 | M | Chain Linked | | | | | | | | | SF | G | | 3 | PC | Gate | | SF | GB | | 4 | PC | Barrier | | SF | GR | | 4 | PC | Rolling/Sliding | | SF | GS | | 4 | PC | Swing | | SF | GT | | 4 | PC | Tilting | | | | | | | | | SF | * | **** | 5 | | Height/Width (cm) | | SF | F | .... | 5 | M | - any number - | | SF | G | .... | 5 | PC | - any number - | | | | | | | | | SF | *_* | | | | Type Details | | SF | F_* | | 6 | M | | | | | | | | | | SF | G_1 | | 6 | PC | Single | | SF | G_2 | | 6 | PC | Double | | | | | | | | | SF | *__* | | 7 | | Operation Method | | | | | | | | | SF | F | | 7 | M | | | | | | | | | | SF | G__H | | 7 | PC | Manual Operated | | SF | G__M | | 7 | PC | Motor Operated | | | | | | | | | ST | * | | 3 | | Construction Component | | ST | ** | | 4 | | Component Details | | | | | | | | | ST | J | | 3 | M3 | Concrete | | ST | J1 | | 4 | M3 | Foundation Ring | | ST | J2 | | 4 | M3 | Anchor Slabs | | ST | J3 | | 4 | M3 | Bottom Drain Pits | | | | | | | | | ST | M | | 3 | M3 | Groundwork | | ST | M1 | | 4 | M3 | Excavation | | ST | M2 | | 4 | M3 | Terp Filling (incl.Compaction) | | ST | M3 | | 4 | M3 | Backfilling | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | ST | P | | 3 | M2 | Finishing | | ST | P1 | | 4 | M2 | Finish Top | | ST | P2 | | 4 | M2 | Finish Shoulders | | | | | | | | | ST | *_* | | 5 | | Construction Component | | ST | *_** | | 6 | | Construction Component Details | | | | | | | | | ST | J_1 | | 5 | M3 | Concrete | | ST | J_11 | | 6 | M3 | Concrete | | ST | J_12 | | 6 | M3 | Blinding | | ST | J_13 | | 6 | M2 | Formwork | | ST | J_14 | | 6 | KG | Bolts | | ST | J_15 | | 6 | KG | Inserts | | | | | | | | | ST | J_2 | | 5 | KG | Rebar | | ST | J_21 | | 6 | KG | Mild Steel Bars | | ST | J_22 | | 6 | KG | High Tensile Steel Bars | | ST | J_23 | | 6 | KG | Wire Mesh | | | | | | | | | ST | J_3 | | 5 | EA | Prefabrication | | | | | | | | | ST | M | | 5 | KG | | | ST | M | | 6 | KG | | | ST | P | | 5 | KG | | | ST | P | | 6 | KG | | | | | | | | | | ST | ____* | | 7 | | Material Code | | ST | J | | 7 | M2 | | | ST | M | | 7 | M2 | | | | | | | | | | ST | P___A | | 7 | M2 | Site Soil | | ST | P___B | | 7 | M2 | Clean Sand | | ST | P___C | | 7 | M2 | Clay | | ST | P___D | | 7 | M2 | Gravel | | ST | P___E | | 7 | M2 | Crushed Stone | | ST | P___F | | 7 | M2 | Blast Furnace Slags | | ST | P___G | | 7 | M2 | Asphalt | | ST | P___H | | 7 | M2 | Sand-Bitumen | | ST | P___J | | 7 | M2 | Concrete | | ST | P___K | | 7 | M2 | Concrete-Asphalt | | ST | P___L | | 7 | M2 | Macadam | | ST | P___M | | 7 | M2 | Plastic Foil | | ST | P___O | | 7 | M2 | Selected Material | | | | | | | | | ST | P | *** | 8 | | Layer Thickness (mm) | | ST | F | | 8 | M2 | | | ST | M | | 8 | M2 | | | ST | P | ... | 8 | M2 | - any code - | | | | | | | | | SL | * | | 3 | | Component | | SL | A | | 3 | KG | Jetty Piers | | SL | B | | 3 | KG | Quays | | | | | | | | | SL | _* | | 4 | | Component Details | | SL | _F | | 4 | LOT | Firefighting | | SL | _J | | 4 | M3 | Concrete Work | | SL | _L | | 4 | EA | Piling | | SL | _M | | 4 | M3 | Groundwork | | SL | _Q | | 4 | M | Sewers | | SL | _S | | 4 | KG | Steel Work | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | SG | * | | 3 | | Basin Group | | SG | ** | | 4 | | Basin Type | | | | | | | | | SG | A | | 3 | M3 | Utility Service Basins | | SG | A1 | | 4 | M3 | Cooling Tower Basins | | SG | A2 | | 4 | M3 | Fire Water Holding Basins | | | | | | | | | SG | B | | 3 | M3 | Effluent Treatment Basins | | SG | B1 | | 4 | M3 | API Separator Basins | | SG | B2 | | 4 | M3 | TPI Separator Basins | | SG | B3 | | 4 | M3 | Flotation Basins | | SG | B4 | | 4 | M3 | Flocculation Basins | | SG | B5 | | 4 | M3 | Sludge Pits | | SG | B6 | | 4 | M3 | Neutralization Basins | | | | | | | | | SG | C | | 3 | M3 | Process Service Basins | | SG | C1 | | 4 | M3 | Sulphur Pits | | | | | | | | | SG | __* | | 5 | | Construction Component | | SG | __** | | 6 | | Construction Component Details | | | | | | | | | SG | __1 | | 5 | M3 | Concrete | | SG | __11 | | 6 | M3 | Concrete | | SG | __12 | | 6 | M3 | Blinding | | SG | __13 | | 6 | M2 | Formwork | | SG | __14 | | 6 | KG | Bolts | | SG | __15 | | 6 | KG | Inserts | | SG | __16 | | 6 | M2 | Lining | | | | | | | | | SG | __2 | | 5 | KG | Rebar | | SG | __21 | | 6 | KG | Mild Steel Bars | | SG | __22 | | 6 | KG | High Tensile Steel Bars | | SG | __23 | | 6 | KG | Wire Meshes | | | | | | | | | SG | __3 | | 5 | EA | Prefabrication | | | | | | | | | SG | __4 | | 5 | EA | Miscellaneous Steel Items | | | | | | | | | SJ | * | | 3 | | Work Group | | SJ | ** | | 4 | | Work Details | | | | | | | | | SJ | A | | 3 | M3 | Large Items | | SJ | A1 | | 4 | M3 | Road Crossings | | SJ | A2 | | 4 | M3 | Firewalls | | SJ | A3 | | 4 | M3 | Concrete Bundwalls | | SJ | A4 | | 4 | M3 | Culverts | | SJ | A5 | | 4 | M3 | Retaining Walls | | | | | | | | | SJ | B | | 3 | M3 | Small Items | | SJ | B1 | | 4 | M3 | Sleepers | | SJ | B2 | | 4 | M3 | Bund Wall Steps | | SJ | B3 | | 4 | M3 | Pipe Bridge Steps | | SJ | B4 | | 4 | M3 | Anchor Blocks | | SJ | B5 | | 4 | M3 | Hydrant Pads | | SJ | B6 | | 4 | M3 | Ladder Pads | | | | | | | | | SJ | C | | 3 | EA | Pile Cutting | | SJ | C1 | | 4 | EA | Cut-off 0 -1.5 M | | SJ | C2 | | 4 | EA | Cut-off 1.5-2.5 M | | SJ | C3 | | 4 | EA | Cut-off 2.5-5.0 M | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | SJ | | *** | 5 | | Pile Diameter (cm) | | SJ | A | | 5 | | | | SJ | B | | 5 | | | | | | | | | | | SJ | C | ... | 5 | | - any number - | | SJ | __* | | 6 | | Construction Component | | SJ | __** | | 7 | | Construction Component Details | | | | | | | | | SJ | __1 | | 6 | M3 | Concrete | | SJ | __11 | | 7 | M3 | Concrete | | SJ | __12 | | 7 | M3 | Blinding | | SJ | __13 | | 7 | M2 | Formwork | | SJ | __14 | | 7 | KG | Bolts | | SJ | __15 | | 7 | KG | Inserts | | | | | | | | | SJ | __2 | | 6 | KG | Rebar | | SJ | __21 | | 7 | KG | Mild Steel Bars | | SJ | __22 | | 7 | KG | High Tensile Steel Bars | | SJ | __23 | | 7 | KG | Wire Mesh | | | | | | | | | SJ | __3 | | 6 | EA | Prefabrication | | | | | | | | | SJ | __4 | | 6 | EA | Miscellaneous Steel Items | | | | | | | | | SM | * | | 3 | | Groundwork Group | | SM | G | | 3 | M3 | Large basins | | SM | J | | 3 | M3 | Special Concrete Work | | | | | | | | | SM | _* | | 4 | | Groundwork Type | | SM | _** | | 5 | | Groundwork Type Detail | | | | | | | | | SM | _1 | | 4 | M3 | Excavation | | SM | _1H | | 5 | M3 | By Hand | | SM | _1M | | 5 | M3 | By Machine | | | | | | | | | SM | _2 | | 4 | M3 | Backfill | | SM | _2H | | 5 | M3 | By Hand | | SM | _2M | | 5 | M3 | By Machine | | | | | | | | | SM | _3 | | 4 | M3 | Transport | | SM | _3A | | 5 | M3 | Inside Battery Limit | | SM | _3B | | 5 | M3 | Outside Battery Limit | | | | | | | | | SM | _4 | | 4 | LOT | Dewatering | | SM | _4A | | 5 | LOT | Open Pumping | | SM | _4B | | 5 | LOT | Well Pointing | | SM | _4C | | 5 | LOT | Deepwell Pumping | | | | | | | | | SM | _5 | | 4 | LOT | Planking & Strutting | | | | | | | | | SM | _6 | | 4 | M2 | Sheet Piling | | SM | _6P | | 5 | M2 | Permanent | | SM | _6T | | 5 | M2 | Temporary | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | SM | _7 | | 4 | M3 | Filling | | SM | _7A | | 5 | M2 | Site Soil | | SM | _7B | | 5 | M2 | Clean Sand | | SM | _7C | | 5 | M2 | Clay | | SM | _7D | | 5 | M2 | Gravel | | SM | _7E | | 5 | M2 | Crushed Stone | | SM | _7F | | 5 | M2 | Blast Furnace Slags | | SM | _7G | | 5 | M2 | Asphalt | | SM | _7H | | 5 | M2 | Sand-Bitumen | | SM | _7J | | 5 | M2 | Concrete | | SM | _7K | | 5 | M2 | Concrete-Asphalt | | SM | _7L | | 5 | M2 | Macadam | | SM | _7M | | 5 | M2 | Plastic Foil | | | | | | | | | SQ | * | | 3 | | Work Type | | SQ | ** | | 4 | | Work Details | | | | | | | | | SQ | M | | 3 | M3 | Groundwork | | SQ | M1 | | 4 | M3 | Excavation | | SQ | M3 | | 4 | M3 | Transport | | SQ | M4 | | 4 | M3 | Dewatering | | | | | | | | | SQ | P | | 3 | M2 | Lining | | SQ | P1 | | 4 | M2 | Finish Bottom | | SQ | P2 | | 4 | M2 | Finish Slopes | | | | | | | | | SQ | *_* | | 5 | | Construction Material Code | | | | | | | | | SQ | M | | 5 | M2 | | | | | | | | | | SQ | P_A | | 5 | M2 | Soil from Site | | SQ | P_B | | 5 | M2 | Clean Sand | | SQ | P_C | | 5 | M2 | Clay | | SQ | P_D | | 5 | M2 | Gravel | | SQ | P_E | | 5 | M2 | Crushed Stone | | SQ | P_F | | 5 | M2 | Blast Furnace Slags | | SQ | P_G | | 5 | M2 | Asphalt | | SQ | P_H | | 5 | M2 | Sand-Bitumen | | SQ | P_J | | 5 | M2 | Concrete | | SQ | P_K | | 5 | M2 | Concrete-Asphalt | | SQ | P_L | | 5 | M2 | Macadam | | SQ | P_M | | 5 | M2 | Plastic Foil | | | | | | | | | SQ | * | *** | 6 | | Layer Thickness (mm) | | SQ | M | | 6 | M2 | | | SQ | P | ... | 6 | M2 | - any number - | | | | | | | | | SY | * | | 3 | | Work Type | | SY | A | | 3 | M3 | Bridges | | SY | B | | 3 | M3 | Viaducts | | SY | C | | 3 | M3 | Hydraulic Filling | | | | | | | | | SZ | * | | 3 | | Work Type | | SZ | A | | 3 | M2 | Levelling | | SZ | B | | 3 | M2 | Layer Finishing | | SZ | C | | 3 | M2 | Landscaping |
|