J - Foundations Project Account and Cost Code for Foundations | Stem sub | Rest | Detail | Level | UoM | Description | | J | | | 1 | M3 | Foundations | | | | | | | | | J* | | | 2 | | Foundation Group | | JJ | | | 2 | M3 | Equipment & Structure Foundations | | JB | | | 2 | M3 | Building Foundations | | JC | | | 2 | M3 | Concrete Sewer & Firewater Pits | | JE | | | 2 | M3 | Civil Work Electr. & Instrum. | | JP | | | 2 | M2 | Paving | | JL | | | 2 | EA | Piling | | JM | | | 2 | M3 | Earthwork | | JG | | | 2 | M3 | Grouting | | | | | | | | | JJ | * | | 3 | | Foundation Function | | JJ | ** | | 4 | | Foundation Function Details | | | | | | | | | JJ | A | | 3 | M3 | Equipment Foundation | | JJ | A1 | | 4 | M3 | Towers & Vertical Vessels | | JJ | A2 | | 4 | M3 | Horizontal Vessels & Exchangers | | JJ | A3 | | 4 | M3 | Pumps | | JJ | A4 | | 4 | M3 | Compressors | | JJ | A5 | | 4 | M3 | Fired Equipment & /Package Units | | JJ | A6 | | 4 | M3 | Storage Tanks | | JJ | A7 | | 4 | M3 | Miscellaneous Items | | | | | | | | | JJ | D | | 3 | M3 | Structure Foundation | | JJ | D1 | | 4 | M3 | Equipment Supporting Structures | | JJ | D2 | | 4 | M3 | Pipe Supporting Structures | | JJ | D3 | | 4 | M3 | Sheds | | JJ | D4 | | 4 | M3 | Noise Walls | | | | | | | | | JJ | __* | | 5 | | Construction Component | | JJ | __*** | | 6 | | Construction Component Details | | | | | | | | | JJ | __1 | | 5 | M3 | Concrete | | JJ | __11 | | 6 | M3 | Concrete | | JJ | __12 | | 6 | M3 | Blinding | | JJ | __13 | | 6 | M2 | Formwork | | JJ | __14 | | 6 | KG | Bolts | | JJ | __15 | | 6 | KG | Inserts | | | | | | | | | JJ | __2 | | 5 | KG | Rebar | | JJ | __21 | | 6 | KG | Mild Steel Bars | | JJ | __22 | | 6 | KG | High Tensile Steel Bars | | JJ | __23 | | 6 | KG | Wire Meshes | | JJ | __3 | | 5 | EA | Prefabrication | | | | | | | | | JJ | __5 | | 5 | EA | Coating & Linings | | JJ | __51 | | 6 | EA | Asphalt Coating | | JJ | __52 | | 6 | EA | Acid Resistant Lining | | | | | | | | | JJ | __9 | | 5 | EA | Foundation Modifications | | JJ | __91 | | 6 | M3 | Break-up/Removal | | JJ | __92 | | 6 | M2 | Surface Preparation | | JJ | __92A | | 6 | M2 | Chipping-off | | JJ | __92B | | 6 | M2 | Roughening | | JJ | __92Z | | 6 | M2 | Other | | JJ | __93 | | 6 | EA | Anchor Installation | | JJ | __93A | | 6 | EA | Drilling Holes | | JJ | __93B | | 6 | EA | Grout-in Achor Bars | | JJ | __93C | | 6 | EA | Fixing Dowel Bar | | JJ | __93 | ** | 10 | EA | Size Depth cm | | JJ | __93 | .. | 10 | EA | - Any Number - | | JJ | __93 | ___*** | 14 | EA | Size Diameter mm | | JJ | __93 | ___... | 14 | EA | - Any Number - | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | JB | * | | 3 | M3 | Building Group | | JB | ** | | 4 | M3 | Building Function | | | | | | | | | JB | A | | 3 | M3 | Administration Buildings | | JB | A1 | | 4 | M3 | Office Buildings | | JB | A2 | | 4 | M3 | Laboratory Buildings | | JB | A3 | | 4 | M3 | Change Houses | | JB | A4 | | 4 | M3 | General Purpose Buildings | | | | | | | | | JB | E | | 3 | M3 | Electrical Buildings | | JB | E1 | | 4 | M3 | Main Stations | | JB | E2 | | 4 | M3 | Substations | | JB | E3 | | 4 | M3 | Emergency Generator Buildings | | | | | | | | | JB | F | | 3 | M3 | Service Buildings | | JB | F1 | | 4 | M3 | Fire Stations | | JB | F2 | | 4 | M3 | Garages | | JB | F3 | | 4 | M3 | Truck Loading Offices | | JB | F4 | | 4 | M3 | Weigh Houses | | JB | F5 | | 4 | M3 | Guard Houses | | | | | | | | | JB | G | | 3 | M3 | Process Buildings | | JB | G1 | | 4 | M3 | Process Buildings | | | | | | | | | JB | K | | 3 | M3 | Control System Buildings | | JB | K1 | | 4 | M3 | Control Buildings | | JB | K2 | | 4 | M3 | Analyser Houses | | | | | | | | | JB | M | | 3 | M3 | Maintenance Buildings | | JB | M1 | | 4 | M3 | Maintenance Buildings | | | | | | | | | JB | P | | 3 | M3 | Pump & Compressor Houses | | JB | P1 | | 4 | M3 | Compressor Sheds | | JB | P2 | | 4 | M3 | Firewater Pump Houses | | JB | P3 | | 4 | M3 | Pump Houses | | JB | P4 | | 4 | M3 | Boiler Houses | | | | | | | | | JB | S | | 3 | M3 | Storage Buildings & Warehouses | | JB | S1 | | 4 | M3 | Storage Buildings | | JB | S2 | | 4 | M3 | Warehouses | | JB | __* | | 5 | | Construction Component | | JB | __** | | 6 | | Construction Component Details | | | | | | | | | JB | __1 | | 5 | M3 | Concrete | | JB | __11 | | 6 | M3 | Concrete | | JB | __12 | | 6 | M3 | Blinding | | JB | __13 | | 6 | M2 | Formwork | | JB | __14 | | 6 | KG | Bolts | | JB | __15 | | 6 | KG | Inserts | | | | | | | | | JB | __2 | | 5 | KG | Rebar | | JB | __21 | | 6 | KG | Mild Steel Bars | | JB | __22 | | 6 | KG | High Tensile Steel Bars | | JB | __23 | | 6 | KG | Wire Meshes | | JB | __3 | | 5 | EA | Prefabrication | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | JC | * | | 3 | | System Function | | JC | F | | 3 | M3 | Firefighting Systems | | JC | Q | | 3 | M3 | Sewer Systems | | | | | | | | | JC | _* | | 4 | | Item Type | | JC | _1 | | 4 | M3 | Manholes | | JC | _2 | | 4 | M3 | Catchbasins | | JC | _3 | | 4 | M3 | Valve Pits | | JC | _4 | | 4 | M3 | Sump Pits | | JC | _5 | | 4 | M3 | Foundation Slabs | | JC | _6 | | 4 | M3 | Anchor Blocks | | JC | _7 | | 4 | M3 | Concrete Bedding | | JC | _8 | | 4 | M3 | Clean-outs | | JC | _9 | | 4 | M3 | Gutters | | | | | | | | | JC | __* | | 5 | | Construction Component | | JC | __** | | 6 | | Construction Component Details | | | | | | | | | JC | __1 | | 5 | M3 | Concrete | | JC | __11 | | 6 | M3 | Concrete | | JC | __12 | | 6 | M3 | Blinding | | JC | __13 | | 6 | M2 | Formwork | | JC | __14 | | 6 | KG | Bolts | | JC | __15 | | 6 | KG | Inserts | | | | | | | | | JC | __2 | | 5 | KG | Rebar | | JC | __21 | | 6 | KG | Mild Steel Bars | | JC | __22 | | 6 | KG | High Tensile Steel Bars | | JC | __23 | | 6 | KG | Wire Meshes | | JC | __3 | | 5 | EA | Prefabrication | | JC | __31 | | 6 | M3 | 0- 5 m3 Pit volume | | JC | __32 | | 6 | M3 | 5-10 m3 Pit volume | | JC | __33 | | 6 | M3 | 10-20 m3 Pit volume | | JC | __34 | | 6 | M3 | > 20 m3 Pit volume | | | | | | | | | JC | __4 | | 5 | EA | Covers | | JC | __41 | | 6 | EA | Cast Iron Cover | | JC | __42 | | 6 | EA | Grating Cover | | | | | | | | | JC | __5 | | 5 | EA | Coating & Linings | | JC | __51 | | 6 | EA | Asphalt Coating | | JC | __52 | | 6 | EA | Acid Resistant Lining | | | | | | | | | JE | * | | 3 | | Civil Work Function | | JE | E | | 3 | M3 | Civil Work for Electrical | | JE | K | | 3 | M3 | Civil Work for Instrumentation | | | | | | | | | JE | _* | | 4 | | Item Type | | JE | _1 | | 4 | M2 | Cable Protection Tiles | | JE | _2 | | 4 | M2 | Cable Trench Walls | | JE | _3 | | 4 | M | Conduits | | JE | _4 | | 4 | M3 | Cable Pulling Boxes | | JE | _5 | | 4 | M3 | Formstones | | JE | _6 | | 4 | M3 | Cable Gutters | | JE | _7 | | 4 | M3 | Road Crossing Channels | | JE | _8 | | 4 | M3 | Embedded PVC Conduit | | | | | | | | | JE | __* | | 5 | | Construction Component | | JE | __** | | 6 | | Construction Component Details | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | JE | __1 | | 5 | M3 | Concrete | | JE | __11 | | 6 | M3 | Concrete | | JE | __12 | | 6 | M3 | Blinding | | JE | __13 | | 6 | M2 | Formwork | | JE | __14 | | 6 | KG | Bolts | | JE | __15 | | 6 | KG | Inserts | | | | | | | | | JE | __2 | | 5 | KG | Rebar | | JE | __21 | | 6 | KG | Mild Steel Bars | | JE | __22 | | 6 | KG | High Tensile Steel Bars | | JE | __23 | | 6 | KG | Wire Meshes | | JE | __3 | | 5 | EA | Prefabrication | | | | | | | | | JP | * | | 3 | | Paving Type | | JP | ** | | 4 | | Paving Component | | | | | | | | | JP | A | | 3 | M2 | Asphalt Paving | | JP | A1 | | 4 | M2 | Sub Base | | JP | A2 | | 4 | M2 | Base Course | | JP | A3 | | 4 | M2 | Wearing Course | | JP | A4 | | 4 | M2 | Top Layer | | JP | B | | 3 | M2 | Brick Paving | | JP | B1 | | 4 | M2 | Concrete | | JP | B2 | | 4 | M2 | Clay | | | | | | | | | JP | C | | 3 | M2 | Concrete Paving | | JP | C1 | | 4 | M2 | Slabs | | JP | C2 | | 4 | M3 | Curbs | | JP | C3 | | 4 | M3 | Downstands | | JP | C4 | | 4 | M3 | Plinths | | JP | C5 | | 4 | M2 | Wire Meshes | | JP | C6 | | 4 | M | Joints | | JP | C7 | | 4 | M2 | Coloured Concrete | | | | | | | | | JP | G | | 3 | M2 | Gravel Paving | | JP | G1 | | 4 | M2 | Gravel Paving | | JP | G2 | | 4 | M2 | Crushed Stone Paving | | JP | G3 | | 4 | M2 | Slags Paving | | | | | | | | | JP | T | | 3 | M2 | Tiles | | JP | T1 | | 4 | M2 | Concrete Tiles | | JP | T2 | | 4 | M2 | Ceramic Tiles | | JP | T3 | | 4 | M2 | Stelcon(type) Slabs | | | | | | | | | JP | | *** | 5 | | Paving Thickness (mm) | | JP | | ... | 5 | | - any number - | | | | | | | | | JL | * | | 3 | EA | Pile Type | | JL | F | | 3 | EA | Fabricated In-Situ | | JL | S | | 3 | EA | Prefabricated | | | | | | | | | JL | _* | | 4 | | Pile Type Details | | JL | _1 | | 4 | EA | Reinforced | | JL | _2 | | 4 | EA | Prestressed | | JL | _3 | | 4 | EA | Bored | | JL | _4 | | 4 | EA | Driven Temporary Casing | | JL | _5 | | 4 | EA | Driven Permanent Casing | | JL | _6 | | 4 | EA | Composite | | JL | _7 | | 4 | EA | Wood | | JL | _8 | | 4 | EA | Steel | | Stem sub | Rest | Detail | Level | UoM | Description | | | | | | | | | JL | ___*** | | 5 | | Bearing Capacity (tonne) | | JL | ___... | | 5 | EA | - any number - | | | | | | | | | JL | | *** | 6 | | Pile Length (m) | | JL | | ... | 6 | EA | - any number - | | | | | | | | | JL | | ____** | 7 | | Pile Diameter (cm) | | JL | | ____.. | 7 | EA | - any number - | | | | | | | | | JM | * | | 3 | | Groundwork Function | | JM | C | | 3 | M3 | Process Piping | | JM | E | | 3 | M3 | Electrical Cables | | JM | F | | 3 | M3 | Firewater Lines | | JM | J | | 3 | M3 | Foundations | | JM | K | | 3 | M3 | Instrumentation Cables | | JM | Q | | 3 | M3 | Sewers | | | | | | | | | JM | _* | | 4 | | Groundwork Type | | JM | _1 | | 4 | M3 | Excavation | | JM | _2 | | 4 | M3 | Backfilling | | JM | _3 | | 4 | M3 | Transportion | | JM | _4 | | 4 | LT | Dewatering | | JM | _5 | | 4 | LT | Planking & Strutting | | | | | | | | | JM | __* | | 5 | | Execution Method | | JM | __H | | 5 | M3 | By Hand | | JM | __M | | 5 | M3 | By Machine | | | | | | | | | JG | * | | 3 | | Grouting Material | | JG | A | | 3 | M3 | Embeco | | JG | B | | 3 | M3 | Epoxy | | JG | C | | 3 | M3 | Sand-Cement |
|