| Job No |
Client ................................................. |
Date ....................................... |
| 1. |
Is pump start/stop for level control without alarm completed by Electrical or via interposing by Contol Systems Group?
|
| 2 |
Is pump start/stop (HT and LT) by open or close contact?
|
| 3 |
Are compressors (for safety reasons) without local start?
|
| 4 |
Is type of local switches and ordering coordinated? |
| 5 |
Are there running lights, not shown on EFD, located on instrument panel?
|
| 6 |
Are there alarms for transformers, H and V, fire, etc., on instrument panel?
|
| 7 |
Is there any fire proved cable or trunk?
|
| 8 |
Is there any cable routing electrical and instrumentation together?
|
| 9 |
Is cable ordering for power supply and above 1 mm2 by Electrical? |
| 10 |
Is there telephone cable in instrument trench?
|
| 11 |
Are there temperature signals for winding and bearing of electric motors? (intrinsically safe)
|
| 12 |
Are there mA signals for electric heater, speed control, or metering?
|
| 13 |
Is power supply for tank level (Enraf) inclusive distribution, up to instrument, completed by Electrical? |
| 14 |
Is there lighting above local panels required? |
| 15 |
Agree grounding points, is there a clean earth required?
|
| 16 |
Is location of instruments and equipment to be determined for grounding by Electrical?
|
| 17 |
Are there instrumentation details for electrical heat tracing, necessary?
|
| 18 |
Is there electrical power (see also 13) for local analyzers or other instruments? Are local distribution boards required? |
| 19 |
Are there electric space heaters in local panels?
|
| 20 |
Agree estimate loads for instrument power consuming, type of power and is a key-line helpful?
|
| 21 |
Is there telecommuncation, via instrument cable wire, with plug-in desk, microphone of sound power in instrument panel? |
| 22 |
Are there graphics, Amp. meters for electrical or TV screens, in instrument panel?
|
| 23 |
Is location of trunk, junction boxes, switches and local panels on columns determined? |
| 24 |
Who is ordering, cable protection tiles and trench markers?
|
| 25 |
Is cable-pulling contract by Electrical, inclusive cable markers and end protection cover?
|
| 26 |
Is split of responsibility agreed for motor operated valves (MOV)?
|
| 27 |
Is lighting of level gauges and sufficient room (nozzle standout) determined? |
| 28 |
Is coordination for underground by Electrical (See also internal procedure for coordination with Civil) ?
|
| 29 |
Are cables for instruments in electrical trench only to be shown on electrical cable list? (Control Systems Group should make reference only to that list behind cable number.)
|
| 30 |
Is agreed which drawings need both Control Systems and Electrical Group issue approval before sending out?
|
| 31 |
Is subcontract split of work clearly shown on drawings? |
| 32 |
Is a splice box necessary in substation or control room for multicore runs? (One multicore, several destinations). |
| 33 |
Where are timers for pump restart located?
|
| 34 |
Which pumps will have automatic restart after power failure?
|